Why did the Japanese society, "Wang Sicong"
Electric Tar operating specifications
a, first close the bypass valve bypass pipe, and open the inlet valve electric fishing, open vent pipe valve (when operating off slow slow start).
Third, access to electricity while fishing in the inspection and maintenance, in addition to the first operation, but at the same time to be replaced steam purge, plugging Blind, as follows:
5. Check whether the corona wire broken wire, hammer without loss, and timely manner.
Primary current (A) secondary current (mA) made comments bubble wrap kids indicating
No comments:
Post a Comment